Website creation for Switzerland
· by the Agence Web Premium team, Guéliz Marrakech
Direct answer: the Swiss market is one of the most expensive in Europe for the creation of websites: 5,000 to 15,000 CHF for an agency showcase website. A French-speaking agency in Morocco delivers an equivalent result from €250, in 7 days, with FR/DE/EN multilingualism management.
Swiss specificity: multilingualism is not optional. A site that aims beyond the Lake Geneva basin must often exist in French, German and English.
Why are websites so expensive in Switzerland?
In short: The level of salaries and charges. The technical work is the same, the hourly cost is not.
A Geneva or Lausanne agency incurs some of the highest structural costs in Europe. A ten-page showcase website is commonly charged between 5,000 and 15,000 CHF.
The same site requires the same number of working hours in Marrakech. The difference in bill is entirely due to the hourly cost, not to the quality of the result.
Do you manage multilingual FR / DE / EN sites?
In short: Yes. We have always been building trilingual sites, with hreflang markup verified page by page.
Our own site exists in French, English and Arabic — including a right-to-left version, technically more demanding than a German version.
The critical point remains the hreflang. Misconfigured, Google ignores translated versions. We systematically check it before putting it online.
Where is the data hosted?
In short: On a European infrastructure by default. Accommodation in Switzerland is possible on request for regulated sectors.
For most activities, European hosting with a content delivery network offers excellent performance from Geneva, Lausanne or Zurich.
For sectors subject to specific data localization requirements — health, finance, legal — we deploy with a Swiss host, with an additional cost that we quantify in advance.
How does payment work?
In short: By international transfer or Wise, in euros or Swiss francs. Payment in two installments, with model validated before the first payment.
Wise is generally the most economical solution from Switzerland: reduced fees and real exchange rate.
We issue a detailed invoice for the provision of services, usable in Swiss accounting.
What responsiveness from Morocco?
In short: Response in less than an hour during the day, Monday to Saturday, 10 a.m. to 8 p.m. Swiss time. Maximum one hour difference.
Proximity in time is a real advantage compared to Asian service providers. A message sent in the morning receives a response in the morning.
We offer a weekly meeting by videoconference for projects that justify it.
Comparison for a Swiss company
| Criteria | Swiss agency | Agence Web Premium |
|---|---|---|
| Showcase website | 5,000 – 15,000 CHF | from 250 € |
| Deadline | 8 to 16 weeks | 7 days |
| Multilingual FR/DE/EN | paid option | included |
| Tracking included | 3 to 6 months | 12 months |
| Working language | French | French |
| Time difference | none | 1 hour maximum |
Frequently asked questions
How much does a website cost in Switzerland?
Between 5,000 and 15,000 CHF in an agency for a showcase website. We deliver it from €250, in seven days.
Do you make sites in German?
Yes, as well as in English and Italian if necessary, with correctly configured hreflang markup.
Where will my data be hosted?
On a European infrastructure by default. Swiss accommodation is possible on request for regulated sectors.
How to pay from Switzerland?
By Wise (the most economical) or by international transfer, in euros or Swiss francs.
Will the site comply with the Swiss LPD?
We apply the GDPR standards, which cover most of the requirements of the revised LPD. For sensitive cases, we refer you to a lawyer.
Is there a time difference?
One hour in winter, none in summer. We work from 10 a.m. to 8 p.m. Swiss time, Monday to Saturday.
Can I see your achievements?
Yes, twelve customer sites are online and can be visited.
Do you offer maintenance?
Yes, twelve months included, then an optional contract.
A Swiss site, without the Swiss price
Multilingual FR/DE/EN included, mockup within 48 hours, delivery in 7 days.


